Our service personnel will conduct a site visit to freeze location of the digester, gas storage and stove. Availability of utilities will also be checked and the client will be informed of any modifications to be carried out. The date and time of installation will be scheduled.
During installation, the digester will be fitted and charged with starter bacteria and left for a week to 10 days for the bacteria to multiply. Another visit is conducted to check the quality of gas produced. After which you may start feeding the digester following the Start-up Feed Schedule.
It is very important to follow the feed schedule to ensure bacteria multiply and do their job. Overfeeding will disturb the process and a complete restart may be needed.